Monday, September 19, 2016

Another Layout Design Tweak......

OK....the benchwork is now completed and with that brings the final update to the track plan. Or at least the mainline branch, including the swinging gate to complete the "around the walls" continuous run.

Benchwork as completed looking from south to north.

Benchwork looking from north to south.

Just finished up the swinging gate, very similar to the one model railroader did on their video series, "Rehab My Railroad" on Chuck Sable's layout. The plywood tops are all on, legs braced and squared up..

The 'dock' where the swinging gate locks into.

The swinging gate in the down position.

Swinging gate in the 'ready mode' for running trains.


Now I can turn my attention to transferring some sort of track plan to the plywood. At this point I will most likely be running a single line around the room, passing thru the scenery only once. There will be various small towns/whistle stops along the route...including Harte Siding/Charleswood, Sanford, Brunkild, Sperling and possibly Carman.

The peninsula will be designed around either a cement plant or potash plant. This will be down the road aways though. For now, my main priority will be to get the circuit around the walls done and start running some trains.   :)

Also have a few model kits in the works, still in box. All three will be kit bashed and modified to a lesser or greater degree so as to fit the parameters of my layout. They will not be built as per stated names on the box cover. As Tony Koester liked to say, "There is another model hidden in the box"

A few kits to start.





No comments:

Post a Comment